Port of Duqm
Duqm Bunker Terminal
A fully commissioned greenfield bunker terminal at Port of Duqm — designed for reliability, scale and operational excellence.
30,000 m³Terminal capacity
4 tanks2 × 10,000 + 2 × 5,000 m³
3 gradesHSFO · VLSFO · LSMGO
Specifications
Built for scale, commissioned for reliability.
- 30,000 m³Total storage
- 4 tanks2 × 10,000 m³ · 2 × 5,000 m³
- 3 gradesHSFO · VLSFO · LSMGO
- Fully commissionedGreenfield bunker terminal
Products handled
- Heavy fuel oilsVLSFO / HSFO
- Lighter distillatesMGO / LSMGO
- Marine lubricants
Infrastructure
- Piping
- Pumps
- Valves
- Electrical systems
- Mechanical systems
- Civil and structural works
Duqm Bunker Terminal
Explore the infrastructure.
Select a system or follow the fuel through the terminal.
Illustrative, not to scale.
Supply readiness
Ready when you arrive.
A commissioned terminal with barge, road tanker and ex-pipe delivery means supply is arranged around your schedule, not the other way round.